Deadlock in a 2 or 4 apartment VvE: what to do when votes tie
Updated: November 24, 2026
Short answer
In a VvE with two or four apartments, a tied vote means nothing happens. Here's what the rules say about tied votes, six things to agree in writing, and the steps from a kitchen-table talk to mediation, an outside board member and the subdistrict court.

Short answer: under the 2017 model regulations, a proposal is deemed rejected when the votes on it are tied (art. 54.2). So in a VvE with two equal owners, or four owners split two against two, nothing gets decided. Agree in writing how you'll decide before there's a conflict, try a structured conversation and then mediation, and know your legal exits: an independent board member (art. 5:131(2) Dutch Civil Code) or substitute authorization from the subdistrict court when an owner refuses to cooperate without good reason (art. 5:121).
Updated 24 November 2026
The Buur VvE app (mijn-buur.nl) is made for small VvEs, where every vote is personal. This guide is general information, not legal advice.
How small VvEs get stuck
Owners described a few familiar situations online this fall. We've left out names.
- Two households, 50% each. The roof leaks, the neighbors won't let the drain inspector in, and two versions of the minutes are going around (r/juridischadvies).
- Four apartments, three against one. The ground floor wants an extension in front of the first-floor balcony. The top two floors vote yes because they won't see it (r/AskNetherlands).
- Four apartments, two against two. A tie on a quote for new frames, so the old ones keep leaking.
What the rules say
Decisions are made by an absolute majority of the votes cast unless the articles say otherwise (art. 5:127(1)). Under the 2017 model regulations, a tie on a matter means the proposal is rejected, and a tie on people leads to a re-vote and, if needed, drawing lots (art. 54.2). Because no decision was made in a tie, there's also nothing to annul.
Ways out of a deadlock
MR 2017 art. 54.3
Decide in writing
A proposal every voter agrees to by email counts as a meeting decision. Needs unanimity.
MR 2017 art. 67
Mediation or binding advice
Owners can jointly choose mediation, binding advice or arbitration.
Art. 5:131(2) BW
Outside board member
The board doesn't have to come from the owners.
Art. 5:121 BW
Subdistrict court
Can replace an owner's refusal to cooperate, without good reason, with an authorization.
Dutch Civil Code art. 5:121, 5:130 and 5:131(2); Model Regulations 2017, art. 54.2, 54.3, 56.1(b) and 67. Check your own regulations.
Step 1: know your own rules
Check your deed of division to see which model regulations apply, for example the 1992, 2006 or 2017 version, and how many votes each apartment has. They aren't always equal. Check whether you have house rules. For more on majorities, see Quorum and majorities in a VvE.
Step 2: put these six things in writing, ideally before a conflict
- What a proposal looks like. In writing, with a quote, the cost per apartment, and a reply date.
- How you decide outside a meeting. Under the 2017 model regulations, a proposal all voters agree to in writing or by email counts as a decision of the meeting (art. 54.3). Only works with everyone on board, but in a small VvE it's often fastest.
- Who decides on parts one owner pays for. The 2017 model regulations let the meeting decide that decisions about parts whose costs fall on one owner or a group are made only by those owners, set out in the house rules (art. 56.1(b)).
- Access for inspections. Owners and occupants must give the board, and people it appoints, access to their apartment when needed for the board's job (art. 5:132). Agree on how you announce a visit.
- One version of the minutes. Who takes them, how fast the draft goes around, how they're approved.
- What happens when you're stuck. For example: a conversation with a set agenda, then mediation, then an independent third party.
Step 3: talk, then try mediation
Start with one clear question and one clear deadline. If that fails, a mediator can help. Mediation only works if both sides want it (Juridisch Loket). Many municipalities offer neighborhood mediation (buurtbemiddeling). The Dutch courts also run voorRecht-rechtspraak, which can guide a conversation about running a VvE before anyone goes to court.
Step 4: bring in an outsider
Together you can appoint an independent board member, since the board doesn't have to come from the owners (art. 5:131(2)). For one difficult meeting, ask an independent chair. An outsider helps most when trust is gone, less so for a single decision.
Step 5: the subdistrict court, as a last resort
- Substitute authorization. If an owner refuses without good reason to cooperate with work on the shared parts, the subdistrict court (kantonrechter) can replace that cooperation with an authorization (art. 5:121).
- Annulment. If a decision was taken and you disagree, file within one month of when you knew or could have known about it (art. 5:130(2)).
What's changing, and what isn't yet
A draft bill would let VvEs decide on maintenance and sustainability by 50% plus one of the votes present (internetconsultatie.nl). That wouldn't solve a true 50/50 tie, and it's not law. A November 2026 civil service report also floats a low-threshold disputes committee for VvEs as a policy option (IBO fiche bundle). That's a proposal too.
A worked example
An upstairs and a downstairs neighbor, 50% of the votes each. The roof leaks. Owner A proposes a repair for €2,400 with a quote. Owner B votes no. Rejected. A sends a written proposal with two quotes and a reply date. B still refuses, without giving a reason. They try buurtbemiddeling. B agrees to an inspection but not the repair. A asks the subdistrict court for substitute authorization under art. 5:121, attaching the quotes, the inspection report and the emails.
Checklist
- Model regulations and votes per apartment checked
- Proposal format agreed, with quote and reply date
- Deciding by email agreed (only with unanimity)
- Access for inspections agreed
- One minute-taker and a fixed way to approve the minutes
- Step plan for when you're stuck: talk, mediation, outsider, court
- The one-month annulment deadline in your calendar
FAQ
Can the chair have a casting vote?
Not under the 2017 model regulations, where a tie on a matter means rejection. Some deeds have other rules. Check yours.
Can we just change how many votes each apartment has?
Not easily. Votes follow from the deed of division. Changing the deed takes a notarial deed and either everyone's cooperation or a meeting decision with at least four fifths of all votes (art. 5:139).
Is a tied vote something I can take to court?
There's no decision to annul. But if the other owner refuses without good reason to cooperate with necessary work, art. 5:121 is the route.
Does an outside manager solve a deadlock?
Only if you both agree to appoint one, or the meeting decides it. It works best as a neutral party.
Deciding together, without the hassle
In Buur you put a proposal and its quote to the owners, votes are counted using the numbers in the deed of division, and discussions, meetings and minutes sit together. Sign up at mijn-buur.nl.
This article is general information, not legal advice. Your own deed of division and regulations come first. In a dispute, get advice, for example from the Juridisch Loket or a lawyer.
Read also: how to handle a VvE with two apartments, even when you disagree.
Sources: Dutch Civil Code Book 5, art. 5:121, 5:127, 5:130, 5:131, 5:132 and 5:139 (wetten.overheid.nl); Model Regulations 2017 (KNB), art. 54, 56.1 and 67; Juridisch Loket; voorRecht-rechtspraak; internetconsultatie.nl; IBO "Nieuwe energie" fiche bundle, 15 November 2026; Reddit threads r/juridischadvies (26 October 2026) and r/AskNetherlands (12 November 2026).


