Waking up a dormant VvE, step by step: a six-week restart plan
Updated: November 24, 2026
Short answer
A practical six-week plan to restart a dormant VvE in a small building, with what to send to KVK and what to agree at the first owners' meeting.

Updated 24 November 2026 · From the team behind the Buur VvE app (mijn-buur.nl).
Short answer: a dormant VvE still exists and its legal duties still apply. To restart it: get the deed of division, list the owners, check the KVK registration, call a first owners' meeting, appoint a board and a chair, and register the board with KVK within a week. Then open an account in the VvE's name, check the buildings insurance and start saving for the reserve fund. In a small building this can be done in about six weeks.
This article is the practical six-week restart plan: deed, owners, KVK, first meeting, bank and insurance. For the overview of your duties and the 9 steps, see how to activate a dormant VvE.
A dormant VvE is still a VvE
When a building is divided into apartment rights, every owner is a member of the VvE by law (art. 5:125(2) Dutch Civil Code). Not meeting does not end that. The reserve fund duty still applies (art. 5:126), and KVK states that a dormant VvE must also be registered in the Trade Register (KVK).
Most dormant VvEs wake up for one of three reasons: the roof leaks, someone wants to sell, or a bank asks questions. At a sale, the notary needs a statement from the board on what the seller owes and how big the reserve fund is (art. 5:122(5) and (6)). KVK also notes that banks check whether the VvE is registered when an apartment is sold, and that a missing registration can cause problems for the buyer's mortgage.
Already know the basics? We also have a shorter overview: How to activate a dormant VvE. This post is the hands-on plan.
The six-week plan
Restarting a dormant VvE
Week 1
Get the deed of division and regulations
Order a copy from the Kadaster if you don't have one
Week 1
List all owners and contact details
Who owns which apartment, and how many votes
Week 2
Check the KVK register
Is the VvE listed, and who is on the board?
Week 2
Send the meeting notice
Agenda, date, place, proposals
Week 4 to 5
First owners' meeting
Chair, board, budget, reserve fund, bank, insurance
Within a week after
Register the board with KVK
Form 22, or forms 5 and 22 if not registered yet
Week 6
Bank account, insurance check, first contributions
Reserve money on its own account
Suggested pace for a small building. Your articles set the notice period for the meeting.
1. Get the deed of division and the regulations
The deed sets the rules of your VvE: the fractions, the votes, how meetings are called and who insures the building. If you don't have it, you can order a copy from the Kadaster. Many deeds refer to model regulations; check which version yours uses (notaris.nl). Is the deed from before 1 December 1972 and does it not mention a VvE? KVK explains that a VvE was not required then, so read their note before you register anything.
2. List the owners
Write down who owns each apartment, with their contact details, fraction and number of votes. For apartments you're unsure about, the Kadaster records the owner.
3. Check the KVK registration
Look up the VvE in the Trade Register. Three outcomes are possible: it is registered with a current board, it is registered with an old board, or it is not registered at all. Only a board member can file the registration. Not registering is an offense, and KVK notes that all owners are jointly and severally liable for a fine.
4. Call the first meeting
Normally the board or the chair of the meeting calls it (art. 5:127(2)). If there is no board, check the articles in your deed for who else may call a meeting and with what notice. KVK's advice for a VvE without a board is simply: organize a meeting with the owners and appoint the board there. For notice periods and a sample letter, see VvE meeting notice.
5. The agenda for the first meeting
- Appoint a chair of the meeting (art. 5:127(2)).
- Appoint the board. It can be one person, unless the articles require more (art. 5:131).
- Agree on the bank account and who may use it.
- Check the buildings insurance: who arranges it and against which risks follows from the regulations (art. 5:112(1)(d)).
- Choose the reserve fund route: an MJOP or at least 0.5% of the rebuild value per year (art. 5:126(2)).
- Set a budget and the monthly contribution per apartment.
- Agree on an audit committee if your regulations ask for one.
Have the minutes signed and keep the attendance list, signed by all owners present. KVK needs both.
6. Register the board with KVK
Send form 22 (and form 5 if the VvE is not registered yet), a copy of each board member's ID, the signed minutes of the appointment and the signed attendance list. A first registration must be filed within a week, and so must a change (art. 20 Trade Register Act 2007). For a first registration, KVK also asks for a copy of the deed of division: certified by the board if the VvE was set up before 1 July 2008, an original notarial copy if it was set up after.
7. Bank, insurance and the first contributions
Open a current account and a separate reserve fund account in the VvE's name (art. 5:126(3)). Ask for the insurance policy and check the rebuild value on it. Then send owners the amount, the IBAN and the start date.
Frequently asked questions
What if one owner refuses to cooperate?
Try talking first. If an owner refuses without a reasonable ground to cooperate with something that needs their consent, the subdistrict court (kantonrechter) can replace that consent with an authorization (art. 5:121(1)).
Who acts when there is no board?
If the board is absent or unable to act, the chair of the owners' meeting takes its place, unless the articles or the meeting have arranged something else (art. 5:133(1)).
Do we have to make up for the years we didn't save?
Article 5:126 sets a minimum yearly reservation. It doesn't contain a specific catch-up rule for missed years. In practice, an MJOP shows what the building needs, and that is often more than the minimum. Discuss it at the meeting.
Can we dissolve the VvE instead?
Only after the division into apartment rights has been cancelled, by notarial deed (KVK).
Keep it awake
With the Buur VvE app, the Basis op orde checklist shows what your VvE already has in place and what is still open, such as KVK, the reserve fund, accounts, insurance and the audit committee. Buur does not arrange those things for you, but it keeps the list in view. Sign up at mijn-buur.nl
This article is general information, not legal advice. Always check your own deed of division and regulations.
Read also: how to bring a dormant VvE back to life in 9 steps.


